0 CART
items in your cartto quote
Ooops no items were found.
Try something else.
Ok
Loading…

Lead-In Whip Hose: 1/2" ID, 4'

Category Air Hose
39776521

Lead-In Whip Hose: 1/2" ID, 4'

Item Code: 39776521
Lead-In Whip Hose: 1/2" ID, 4' 300 Working psi, -40 to 140 ° F, Green, Hybrid Polymer, MNPT Swivel x MNPT, 1/2"
Category Air Hose
UNSPSC Code

40142009

Weight

0.46lb

Height

0.75in

Width

9in

Length

15in

Brand

LEGACY

Category

Air Hose

Lead-In Whip Hose: 1/2" ID, 4'

Category Air Hose
39776521

Lead-In Whip Hose: 1/2" ID, 4'

Item Code: 39776521
Lead-In Whip Hose: 1/2" ID, 4' 300 Working psi, -40 to 140 ° F, Green, Hybrid Polymer, MNPT Swivel x MNPT, 1/2"
Category Air Hose
UNSPSC Code

40142009

Weight

0.46lb

Height

0.75in

Width

9in

Length

15in

Brand

LEGACY

Category

Air Hose

SEARCH ×