0 CART
items in your cartto quote
Ooops no items were found.
Try something else.
Ok
Loading…

Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2'

Category Air Hose
04541702

Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2'

Item Code: 04541702
Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2' 300 Working psi, -40 to 212 ° F, Gray, Rubber, MNPT (Ball Swivel) x FNPT, 1/4"
Category Air Hose
UNSPSC Code

40142009

Weight

0.5lb

Brand

Plews & Edelman

Category

Air Hose

Color

Gray

End Connections

MNPT (Ball Swivel) x FNPT

Fitting Size

1/4

Hose Type

Lead-In Whip Hose

Inside Diameter (Inch)

1/4

Length

2

Material

Rubber

Maximum Temperature (F) ( - 0 Decimals)

212

Minimum Temperature (Deg F - 3 Decimals)

-40

Outside Diameter (Decimal Inch - 4 Decimals)

0.5310

Outside Diameter (Inch)

17/32

Type

Lead-In Whip Hose

Working Pressure

300

Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2'

Category Air Hose
04541702

Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2'

Item Code: 04541702
Lead-In Whip Hose: 1/4" ID, 17/32" OD, 2' 300 Working psi, -40 to 212 ° F, Gray, Rubber, MNPT (Ball Swivel) x FNPT, 1/4"
Category Air Hose
UNSPSC Code

40142009

Weight

0.5lb

Brand

Plews & Edelman

Category

Air Hose

Color

Gray

End Connections

MNPT (Ball Swivel) x FNPT

Fitting Size

1/4

Hose Type

Lead-In Whip Hose

Inside Diameter (Inch)

1/4

Length

2

Material

Rubber

Maximum Temperature (F) ( - 0 Decimals)

212

Minimum Temperature (Deg F - 3 Decimals)

-40

Outside Diameter (Decimal Inch - 4 Decimals)

0.5310

Outside Diameter (Inch)

17/32

Type

Lead-In Whip Hose

Working Pressure

300

SEARCH ×